欧美午夜精品一区二区三区-自拍偷拍校园春色-黄色片链接-91精品91久久久-华人在线视频-成人一区二区三区在线-婷婷色国产偷v国产偷v小说-亚洲美女在线视频-天天干夜夜欢-一级片毛片-精品精品国产男人的天堂-jizz美女-免费成人91-国产综合在线观看视频-一本到久久-97超视频在线观看-污污的视频软件

Welcome to the official website of Nanchong Lefuer Industry & Trade Co., Ltd.!National Service Hotline:13858928298
Products
Sitemap:Home ? Products ? Pot painting equipment (non-stick pan,...

Product name:Aluminum pot automatic spraying line

Contact: Mr. Xu

Phone:13858928298

Email: ykxiongliang@163.com

Address: No. 208, Airport Road, Gaoping District, Nanchong City, Sichuan Province

Notice for use

Aluminum pan in the automatic assembly line

warning

Gashigh temperature drying tunnel, pipeline operation process and usage information

 

 

1. Before starting the machine, check or adjust the set temperature of each heating section to meet the process temperature of the coating. Generally, the inner coating temperature is not the same as 150-280 °C, and the second section is 380-430 °C. Different coatings should be slightly adjusted), generally the temperature of the external coating is set to a period of 120-200 ° CC, the second section is 260-300 ° C (if the paint is different, it should be diluted), after setting the process temperature of each group The switch should be connected to the measuring position.

2. Check if the tachometer is at zero position. If it is not at the zero position, turn it to the left position. Then turn on the belt motor and rotate the tachometer to adjust the speed of the belt to the line speed required by the process.

3. Before starting the dry furnace or sintering furnace, first check whether the natural gas pressure gauge is in the normal range (10G dynamic pressure is 3-5kp, 34G dynamic pressure is 4-6kpa).

4, start the holding fan, start the burning machine (you must first start the mixing fan and then start the burner!!!)

5. Observe the thermometer. If the process temperature is reached, you can start to put the workpiece into production.

6. Each piece of product should be inspected for quality to meet the standard requirements.

 

Precautions

1. The operator must carry out training. The personnel who are instructed by the train or the car should not trace the full electrical switch, process temperature, damper and mesh belt running speed.

2. Before starting the machine, check whether the motors are running normally. If there is abnormal sound, stop the machine immediately.

3. During the operation, if the mesh belt is found to be loose, it should be adjusted in time.

4. After each shift is warmed up, if the temperature is abnormal, check whether the burner or thermocouple is abnormal.

5. At the end of the work, the other power supply should be turned off, but the circulating fan should be shut down automatically after 15 hours, so as to avoid the overheating damage of the burner on the combustion chamber caused by the immediate shutdown!!

 

Paint operation process and method

1 General single-layer silicon coating, just after opening the package, stir it evenly with a wooden stick, put a proper amount of thinner, filter it through a 200-250 mesh filter and put it into a pressure tank or a pressure pump to carry out the coating operation; If the paint is different, it should be adjusted)

2, the spray gunner should adjust the angle of the spray gun, the amount of oil from the distance, so as not to cause unnecessary waste.

3. When the workpiece is sprayed into the drying oven, it should be checked whether the product meets the product quality standard. The above should be a little touched (the residual heat can not be too high) before the surface coating operation; (with or without sag, partiality, etc.) Into the drying oven; check the color after drying, whether there is any abnormality, compared with the swatch, no abnormality, can be normal production

 

 

Fourth, maintenance and maintenance

1. Regularly refuel the rotating bearings and add a butter to the rotating chain once a week.

2, the gearbox adds butter every three months, and replaces the butter once a year.

3. Each motor, fan, water pump and electrical components should be inspected regularly. If abnormal sound is found during work, it must be shut down for inspection.

 

After-sales phone: 86-579-8725537615157964788

Yongkang Lefuer Coating Equipment Co., Ltd.

 


称多县| 昭通市| 沅陵县| 云安县| 兴宁市| 乳源| 石泉县| 太和县| 定襄县| 清水河县| 玉林市| 凤城市| 射洪县| 高安市| 寿宁县| 登封市| 宣汉县| 措勤县| 宝应县| 新乡县| 封丘县| 阿坝| 曲阜市| 海林市| 南充市| 晋城| 仁化县| 平潭县| 武鸣县| 静安区| 延边| 沁阳市| 台州市| 隆昌县| 沧源| 浙江省| 天长市| 怀集县| 兴仁县| 济南市| 南和县|